0

Out of 0 Ratings

Owner's of the Agilent Technologies Welding System Agilent Technologies Welding System gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 134
 
Chapter 2 Quick Start
To prepare the power supply for use
24
1 Remove the power cord.
Remove the fuse-holder assembly
with a flat-blade screwdriver from
the rear panel.
2 Install the corect line fuse.
Remove the power-line voltage
selector from the power-line
3 Rotate the power-line voltage
selector until the correct voltage
appears.
4 Replace the power-line voltage
selector and the fuse-holder
assembly in the rear panel.
Install the correct fuse and verify that the correct line voltage appears in the
window.
100 or 115 Vac, 2.5 AT fuse
230 Vac, 2 AT fuse
100, 115 or 230 Vac